8 Comments
User's avatar
Ruth Sponsler's avatar

This won't happen until the disappearance of the Generation of 1968 plus the German equivalent of younger Boomers/GenX who, in Germany, were extremely heavily involved in the Green Party and the anti-nuclear movement. (This generation was different in the US).

There needs to be a very vibrant and obvious counter-movement among young people who support nuclear energy and a wider return of German engineering.

Unfortunately, there are some years left of German deindustrialization. Germany will watch the world go by until the Boomers and the Greens are gone..

Michael Magoon's avatar

You might be correct, but German public opinion is changing rapidly. I think that it is mainly up to politicians to take advantage of this shift.

Ruth Sponsler's avatar

I'm a bit doubtful about “rapid change” in German public opinion. This is a matter of the dying of the old hippies and slow learning moments for younger people who will finally realize that wind and solar can't do it all.

Niels Harksen's avatar

1) Germany should start with recommissioning old reactors. Note that the date of decommissioning does NOT directly correspond to the effort that is required to bring it back (there is a story behind it). We very likely can get beyond 10 GW this way.

2) Germany already has domestic designs. First the Konvoi AMD it's evolution designs, second the EPR Franco-German crossbreed. Framatome holds the IP, not sure if they will sell it.

3) The deal with Westinghouse makes it impossible for KHNP&KEPCO to sell the APR1400 to Germany, as far as we know.

4) In any case, such a massive build-out should use at least two designs and supply chains for redundancy.

Michael Magoon's avatar

Thanks for the comment.

You may well be correct that by recommissioning more than 10 GW is achievable. I am not familiar with the German designs that you speak of, but I am skeptical that they can be competitive with the cost and construction speed of the South Korean designs. I presume that Germany could legally purchase the APR1400 with a change in legislation.

I am not sure that two designs with two separate supply chains would be better. My guess is that this would significantly increase the cost. I think that it is better to go with a proven design and build it at scale.

Either way, if we agree on the main point of the article that German should build a large number of nuclear power stations, I am open on the implementation details.

Niels Harksen's avatar

We 100% agree on the main point about Germany requiring a large number of NPPs. I-am-part-of-an-organization-that-is-advocating-for-precisely-this agree, in fact.

The German Konvoi design is the one used for the last three German nuclear plants. It was further improved in the years after, but never built again. The first image in your article shows the Pre-Konvoi, the immediate predecessor of this design. It was built even quicker than the APR1400 in the 1980s.

The problem with the APR1400 is that it is based on Combustion Engineering IP that was then acquired by BNFL and then spun off together with Westinghouse, which now owns it. And Westinghouse has used this to sue, and the Koreans have pulled out of Poland for that reason. No doubt this problem can be solved with enough license payments to Westinghouse if Germany insists on using the APR1400.

Using at least two designs in my opinion is necessary to avoid a situation similar to France in 2022, where a common defect forced the shutdown of a significant share of the French fleet concurrently. But even a fleet size of 30 would be large enough for EOS. In any case, having an experienced NPP construction and supplier industry is more important than the design, assuming it is complete.

Tris's avatar

But it looks like Germany will rather invest in missiles and some US weapons to challenge its big Eastern neighbour in the faint hope it could secure some lebensraum in the East. Which makes the question of nuclear fuel origin all the more complicated...

Everything-Optimizer's avatar

Absolutely. Germany should build nuclear power for the same reason they dismantled it in the first place. It's publicly known from the Green Party's own internal investigation that the East German Stasi infiltrated the German Greens and were pivotal in influencing their anti-nuclear platform and activism, which they prioritized for the purpose of de-industrializing West Germany.